Fleming’s Steakhouse


summary

Bonefish projects represent restaurant build-outs across various locations, typically 4,900–6,000 SF with schedules in the 12–20 week range depending on scope and constraints. When schedules are tight, delays usually come from late approvals, long-lead procurement, and uncoordinated trade scopes. TriStone focuses on preconstruction validation, disciplined sequencing, and transparent reporting through Constructable.ai—so stakeholders see progress, schedule status, and decisions needed without chasing updates.

Quick facts

  • Project: Bonefish
  • Location: Various
  • Size: 4,900–6,000 SF
  • Schedule: 12–20 weeks
  • Delivery: General Contracting (primary), supported by Pre-Construction and Owner’s Representation as needed
  • Contract types supported: GMP, Lump Sum/Stipulated Sum, Cost-Plus, Design-Build, CM-at-Risk

The playbook for tighter restaurant schedules

  • Validate scope early (avoid “discoveries” mid-build)
  • Treat long-leads as constraints (not future problems)
  • Plan inspections and turnover readiness early
  • Keep a decision log so approvals don’t stall progress

How TriStone operates

  • Preconstruction-first budgeting and scheduling
  • Weekly look-ahead planning to protect critical path
  • Field documentation via daily logs and progress photos
  • Owner visibility through Constructable.ai

Next step: Schedule a Consultation
Related: ServicesProjects

Flemming’s Steahouse projects represent upscale dining build-outs across various locations, typically 7,500–8,500 SF with schedules ranging from 16–28 weeks depending on scope and constraints. Upscale dining requires finish precision, strong sequencing, and controlled change documentation. TriStone manages these projects with partner-led oversight, disciplined project controls, and transparent reporting through Constructable.ai—supporting faster decisions and reducing last-minute surprises.

Quick facts

  • Project: Flemming’s Steahouse
  • Location: Various
  • Size: 7,500–8,500 SF
  • Schedule: 16–28 weeks
  • Delivery: General Contracting (primary), supported by Pre-Construction and Owner’s Representation as needed
  • Contract types supported: GMP, Lump Sum/Stipulated Sum, Cost-Plus, Design-Build, CM-at-Risk

What drives outcomes on upscale dining

  • finish quality control + sequencing
  • procurement timing for specialty fixtures/materials
  • inspection readiness and turnover documentation
  • change management that stays transparent

How TriStone operates

  • Preconstruction-first scope validation
  • Sequenced trade coordination with proactive risk reviews
  • Transparent reporting via Constructable.ai (logs, photos, schedule, selections, budget signals)
  • Closeout discipline to support smooth turnover